Major Works

Get the big things right first time

CHIC has a wide range of solutions available, which can support small one-off programmes to major reinvestment programmes. As well as elemental planned works, like kitchens, bathrooms, windows and doors, we can also support major multi-elemental projects and specialist programmes including fire prevention & safety and zero carbon.


CHIC SOLUTIONS

Framework Lots

Active Fire and Security

Sprinklers & Optional Misting Systems

Framework Start Date: 23/12/2020
Framework End Date: 22/12/2024

This Lot on the CHIC Active Fire and Security framework is for the installation, replacement, servicing, repair and maintenance of Sprinklers & Misting Systems

More info & Suppliers…
Security Systems & CCTV

Framework Start Date: 23/12/2020
Framework End Date: 22/12/2024

This Lot on the CHIC Active Fire and Security framework is for the installation, replacement, servicing, repair and maintenance of Security Systems & CCTV including heat sensing cameras

More info & Suppliers…
Passenger Lifts

Framework Start Date: 19/04/2021
Framework End Date: 18/04/2025

This Lot on the CHIC Lifts framework is for the Installation, replacement, servicing, repair and maintenance of Passenger Lifts

More info & Suppliers…

Windows and Doors

Aluminium Doors

Framework Start Date: 25/02/2019
Framework End Date: 24/02/2023

This Lot on the CHIC Windows & Doors framework is for the supply of Aluminium Doors with optional supplier replacement

More info & Suppliers…
Aluminium Windows

Framework Start Date: 25/02/2019
Framework End Date: 24/02/2023

This Lot on the CHIC Windows & Doors framework is for the supply of Aluminium Windows with optional supplier replacement

More info & Suppliers…
Canopies

Framework Start Date: 25/02/2019
Framework End Date: 24/02/2023

This Lot on the CHIC Windows & Doors framework is for the supply of Canopies with optional supplier replacement

More info & Suppliers…
Composite Doors

Framework Start Date: 25/02/2019
Framework End Date: 24/02/2023

This Lot on the CHIC Windows & Doors framework is for the supply of Composite Doors with optional supplier replacement

More info & Suppliers…
Roofline & Rainwater Goods

Framework Start Date: 25/02/2019
Framework End Date: 24/02/2023

This Lot on the CHIC Windows & Doors framework is for the supply of Roofline & Rainwater Goods with optional supplier replacement

More info & Suppliers…
Timber Doors

Framework Start Date: 25/02/2019
Framework End Date: 24/02/2023

This Lot on the CHIC Windows & Doors framework is for the supply of Timber Doors with optional supplier replacement

More info & Suppliers…
Timber Fire Doors

Framework Start Date: 25/02/2019
Framework End Date: 24/02/2023

This Lot on the CHIC Windows & Doors framework is for the supply of Timber Fire Doors with optional supplier replacement

More info & Suppliers…
Timber Windows

Framework Start Date: 25/02/2019
Framework End Date: 24/02/2023

This Lot on the CHIC Windows & Doors framework is for the supply of Timber Windows with optional supplier replacement

More info & Suppliers…
UPVC Doors

Framework Start Date: 25/02/2019
Framework End Date: 24/02/2023

This Lot on the CHIC Windows & Doors framework is for the supply of UPVC Doors with optional supplier replacement

More info & Suppliers…
UPVC Windows

Framework Start Date: 25/02/2019
Framework End Date: 24/02/2023

This Lot on the CHIC Windows & Doors framework is for the supply of UPVC windows with optional supplier replacement

More info & Suppliers…

Building Works

Electrical

Framework Start Date: 11/06/2019
Framework End Date: 10/06/2023

This Lot on the CHIC Building Works framework covers electrical works including electrical rewires, electrical testing (EICR), PAT testing, electric heating replacements (servicing repair and maintenance), testing and replacement of smoking and heat detectors

More info & Suppliers…
Fire Spread Prevention

Framework Start Date: 11/06/2019
Framework End Date: 10/06/2023

This Lot on the CHIC Building Works framework covers fire spread prevention works (passive fire stopping) including installation, replacement or repair of fire walls, fire curtains, fire doors or door sets, compartmentation surveys, penetration billing / ceiling, application of class 0 fire rated paint, loft hatches and fire safety signage.

More info & Suppliers…
Heating

Framework Start Date: 11/06/2019
Framework End Date: 10/06/2023

This Lot on the CHIC Building Works framework is for the replacement, servicing, repairs and maintenance of heating systems including boilers, radiators, electric heating and air source heating. Servicing including air source heat pumps, electric boiler wet systems, closed room heaters, ground source heat pumps, oil condensing boilers and biomass wood fuel boilers

More info & Suppliers…
Kitchens & Bathrooms

Framework Start Date: 11/06/2019
Framework End Date: 10/06/2023

This Lot on the CHIC Building Works framework is for the replacement of Kitchens & Bathrooms

More info & Suppliers…
Roofing

Framework Start Date: 11/06/2019
Framework End Date: 10/06/2023

This Lot on the CHIC Building Works framework is for the replacement or repair of roofing including pitched roofing and flat roofing

More info & Suppliers…

Multiple Elements of Built Enviroments

Multiple Building Elements

Framework Start Date: 05/03/2020
Framework End Date: 04/03/2024

This Lot on the CHIC Multiple Elements of Built Enviroments framework is for the renevation or regeneration of individual properties dwellings or schemes including Attached & Adjacent Buildings including Extensions, Bathrooms, Canopies, Decoration, Demolition, Doors, Electricity Generation (Photovoltaics), Electrics, Environmental Improvements External, Environmental Improvements Internal, Fascias, Soffits & Bargeboards, Guttering & Downpipes, Heating, Kitchens, Piling, Remodelling, Roofing Flat, Roofing Pitched, Wall Insulation External, Wall Insulation Internal and Windows

More info & Suppliers…
Decorations (including pre decoration repair)

Framework Start Date: 05/03/2020
Framework End Date: 04/03/2024

This Lot on the CHIC Multiple Elements of Built Enviroments framework covers internal and external decorations including pre decoration repairs

More info & Suppliers…
Restricted Mobility Adaptations

Framework Start Date: 05/03/2020
Framework End Date: 04/03/2024

This Lot on the CHIC Multiple Elements of Built Enviroments framework is for the installation, replacement, refurbishment, improvement or repair of restricted mobility adaptations including extensions, kitchens, bathrooms, ramps, grab rails and DDA compliance

More info & Suppliers…

Building Safety and Planned Works

Framework Start Date: 21/10/2019

This is a CHIC framework for planned works relating to the Installation or Replacement of Kitchens, Bathrooms, Roofing, Electrical and Heating Systems, including Periodic Testing, Servicing & Repair, and Fire Spread Prevention. · Lot 1 – Kitchens and Bathrooms – Installation, Refurbishment and All Related Programmed Works. · Lot 2 – Roofing – Installation, Replacement, Refurbishment and Repair · Lot 3 – Electrical – Installation, Replacement, Refurbishment, Repair, Inspection, Testing and Certifying. · Lot 4 – Heating – Installation, Replacement, Refurbishment, Repair and Servicing. · Lot 5 – Fire Spread Prevention – Fire Stopping and Compartmentation works including Fire Doors and All Related Programmed Works and Inspections.

More info & Suppliers…

Asbestos Abatement

Framework Start Date: 19/04/2021
Framework End Date: 18/04/2024

The majority of the work in this framework will be removal work but limited amounts of asbestos management work will also be required such as encapsulation. Typical work areas will include removal of the following items: • Fascia, barge or soffit board; • Roof tiles; • Downpipes or gutters; • Thermoplastic floor tiles; • Plasterboard ceiling or wall lining with artex; and; • Pipe insulation.

More info & Suppliers…

Timber Fire Door Sets

Framework Start Date: 14/09/2020
Framework End Date: 13/09/2024

This Lot on the CHIC Timber Fire Door Sets framework is for the supply of timber fire door sets with optional supply and installation

More info & Suppliers…

New Build Offsite Manufacture

Framework Start Date: 01/10/2020
Framework End Date: 30/09/2035

Complete and fitted out factory built modular (sometimes called volumetric) homes delivered to site with fully completed modules, coupled or joined together on site including, but not exclusively: • Plumbing connections • Electrical connections • The installation of staircases within dwellings • Sound insulation • Energy insulationVolumetric homes will include briefly and not exclusively: insulated external and party/ internal walls, floors and roofs; internal partitions; windows; external and internal doors; internal wall, floor and ceiling finishes; kitchens; bathrooms; electrical, plumbing, ventilation and heating installations all completed in the factory.Completed dwellings are required to achieve the equivalent of the mandatory energy standard required by Building Regulations using a ‘fabric first’ approach and without the use of renewable technologies.

More info & Suppliers…

Frame and Panel

This framework is a comprehensive offsite Timber MMC Solution for the development of low carbon new homes.

More info & Suppliers…

DPS Categories

All Under One Roof

Aids and Adaptations

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers Internal and External Aids and Adaptations – supply & install or supply only.

More info & Suppliers…
Call Centres

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers Inbound and Outbound Call Centres

More info & Suppliers…
Brickwork

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers Internal & External Brickwork

More info & Suppliers…
Decorating Services

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers Decoration – Internal, External or both.

More info & Suppliers…
Drainage

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers Drain Instalation and cleaning. Inspection and Repair, drain relining, manhole installation and inspections, sewer inspections and sewer repairs.

More info & Suppliers…
Electrical

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers CCTV Installation, door entry , warden Call/Alarms, TV& Radio Aerials/Lightning conductors, Alarms and Emergency Lighting, Rewires, New Installation and Manitenance of Electrical PAT Testing and Electrical Safety Checks

More info & Suppliers…
Fencing and Gates

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers Domestic and Commercial Fencing and Gates

More info & Suppliers…
Groundworks

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers Excavation works, Road Construction, Foundations, Civil Engineering works, concreting of floors, flagging, patios and block paving.

More info & Suppliers…
Heating and Gas

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers general heating services. Boiler servicing and repair. New Boiler installation. Central Heating installations and repairs. Radiator & Towel Rails.

More info & Suppliers…
Insulation

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers Cavity Wall Insulation, External Wall Insulation and Loft/Roof Insulation – supply and install.

More info & Suppliers…
Ironmongery

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers Internal and External Ironmongery

More info & Suppliers…
Joinery

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers Internal & External joinery. This also includes first and second fix joinery, hanging doors, stair installation and fitted wardrobes.

More info & Suppliers…
Kitchens, Bedrooms and Bathrooms

Framework Start Date: 08/10/2018

This Framework provides a one stop shop for kitchen and bathroom upgrades, rewires, repointing, fire prevention works, major projects, void improvement and responsive repairs. It covers kitchens, bathrooms and befroosm supply only or supply and install.

More info & Suppliers…
Plant Hire and Purchase

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers Tool Purchase, Tool Hire. Non- Mechanical Plant Purchase, Non- Mechanical Plant Hire, Mechanical Plant Purchase, Mechanical Plant Hire, Site Welfare/ Accommodation Hire and Site Welfare/ Accommodation Purchase.

More info & Suppliers…
Plastering

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers Plastering & Repairs, Damp and water damage repair, Boarding, skimming, Artex removal and re-covering, Dry Lining, Ceiling reboarding and Rendering

More info & Suppliers…
Plumbing

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers kitchen & bathroom plumbing installation, repairs and pipe repair.

More info & Suppliers…
Scaffolding

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers the supply of scaffolding including erection and dismantling to be used for planned maintenance and responsive repairs.

More info & Suppliers…
Roofing

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS covers New build extensions. Re-roofing, Roof Repairs. Flat Roofing (torch-on felt) and (rubber EPDM). Lead work (flashings, valleys etc). Pitch us (from plat to pitched). Chimneys repointing and repairs. Chimney removal.

More info & Suppliers…
Skips and Waste Management

Framework Start Date: 08/10/2018

Our Waste Services Category is designed to support clients in the Collection, treatment and the recycling or disposal of general waste, bulk waste, dry mixed recycling, confidential waste, food waste, office, building, clinical waste, wood, construction, rubber, soil.

More info & Suppliers…
Windows and Doors

Framework Start Date: 08/10/2018

This Category on the CHIC All Under One Roof DPS is for the Supply of UPC Windows and doors

More info & Suppliers…